|
The main saloon is coming along. The cherry veneer has been laid and as you see here, the settee face is in place and the temporary sole covers the floors. Under the settee is the 36 gallon aft holding tank, one of the battery boxes and , in the foreground, the forward air conditioner compartment.
. Opposite the settee, the refrigerator cabinet and galley peninsular are set and the fiddle rails have been fit. They will remain loosely fitted until the Corian tops are installed. That will be near the end as I am a little to clumsy to work over that expensive surface.
The other battery box, battery switch and main fuses will be hidden in the base of the peninsular. The nav station will be installed between the refrigerator and the main bulkhead.
The galley cabinets are set temporarily so I can get an idea of the galley space. The tall drawer on the right is a pull out trash receptacle, Under the sink is pot storage, A column of narrow drawers on the left will hold silverware and utensils Across the bottom is a roll out wire basket for produce storage. The faces of the drawers will be covered in cherry veneer.
On the left is a view of one of the aft cabins that will not be possible once the cockpit is set. I am trying to get these cabins as complete as possible including varnish before the cockpit makes it necessary to hire an acrobat to reach the back corners.
The round white disks are clean out ports for the 60 gallon water tank built in under the berth.
|